{"id":672,"date":"2026-09-22T14:04:58","date_gmt":"2026-09-22T08:34:58","guid":{"rendered":"https:\/\/bharatdatacenter.com\/blog\/?p=672"},"modified":"2026-09-22T17:36:15","modified_gmt":"2026-09-22T12:06:15","slug":"tier-iii-vs-tier-iv-data-center-design-choosing-the-right-standard","status":"publish","type":"post","link":"https:\/\/bharatdatacenter.com\/blog\/tier-iii-vs-tier-iv-data-center-design-choosing-the-right-standard\/","title":{"rendered":"Tier III vs Tier IV Data Center Design: Choosing the Right Standard"},"content":{"rendered":"<h2><b>Tier III vs Tier IV Data Center Design: Choosing the Right Standard<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Choosing between Tier III and Tier IV data center design isn&#8217;t a question of which one is better, it&#8217;s a question of which redundancy model, uptime guarantee, and construction budget actually match your workload. Get it wrong in either direction, and you either overspend on fault tolerance you&#8217;ll never use, or you under-build a facility that can&#8217;t support the availability your business actually needs. This comparison breaks down what separates the two Uptime Institute standards, what each one costs and takes to build, and how a data center construction consultancy typically helps a project land on the right answer before ground even breaks.<\/span><\/p>\n<p><b>Who this is for:<\/b><span style=\"font-weight: 400;\"> IT and facilities leaders, enterprise infrastructure teams, investors backing a data center build, and organizations evaluating whether to commission a Tier III or Tier IV facility in India.<\/span><\/p>\n<h2><b>What Are Data Center Tiers?<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The Uptime Institute&#8217;s Tier Classification System is the global benchmark for describing a data center&#8217;s expected availability, redundancy, and fault tolerance. It defines four tiers, Tier I through Tier IV, with each tier building on the one before it by adding redundancy, raising expected uptime, and increasing both capital and operational cost.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For most business-critical infrastructure decisions today, the practical comparison sits between Tier III and Tier IV. Tier I and Tier II, single, non-redundant paths with little to no concurrent maintainability, are generally considered insufficient for any workload where downtime carries real business or regulatory consequences. It&#8217;s also worth knowing that a parallel standard, TIA-942, uses &#8220;Rated-1&#8221; through &#8220;Rated-4&#8221; terminology to describe similar levels of resiliency, some projects, particularly outside the US, are evaluated against TIA-942 rather than Uptime Institute directly, so it&#8217;s worth confirming which framework your market or client expects.<\/span><\/p>\n<h2><b>Tier III vs. Tier IV: The Core Technical Difference<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The single biggest distinction between the two standards is this: <\/span><b>Tier III is concurrently maintainable; Tier IV is fault tolerant.<\/b><span style=\"font-weight: 400;\"> Those sound similar, but they solve for different problems.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A <\/span><b>Tier III<\/b><span style=\"font-weight: 400;\"> facility has redundant components and redundant distribution paths, but typically only one path is actively serving load at a time while the other stands ready for maintenance switching. That means planned maintenance can happen without shutting anything down, but if an unplanned failure hits the active path at the wrong moment, there&#8217;s residual risk because a second path isn&#8217;t simultaneously carrying live load.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A <\/span><b>Tier IV<\/b><span style=\"font-weight: 400;\"> facility removes that residual risk by running multiple independent, physically isolated systems simultaneously, commonly described as 2N or 2N+1, so that both planned maintenance and an unplanned equipment failure can happen without affecting the critical environment at all. The physical isolation matters as much as the duplication: it exists specifically so a single event can&#8217;t take down both systems at once.<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td><\/td>\n<td><b>Tier III<\/b><\/td>\n<td><b>Tier IV<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Redundancy model<\/span><\/td>\n<td><span style=\"font-weight: 400;\">N+1 (redundant components, one active distribution path)<\/span><\/td>\n<td><span style=\"font-weight: 400;\">2N or 2N+1 (fully independent, simultaneously active systems)<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Maintainability<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Concurrently maintainable, no shutdown for planned work<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Concurrently maintainable, plus tolerant of unplanned failure<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Fault tolerance<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Limited, risk remains if failure hits the active path<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Built in, a single fault doesn&#8217;t affect operations<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Expected uptime<\/span><\/td>\n<td><span style=\"font-weight: 400;\">~99.982%<\/span><\/td>\n<td><span style=\"font-weight: 400;\">~99.995%<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Approx. annual downtime<\/span><\/td>\n<td><span style=\"font-weight: 400;\">~1.6 hours<\/span><\/td>\n<td><span style=\"font-weight: 400;\">~26 minutes<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Distribution paths<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Redundant, but not fully independent\/active<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Fully independent and physically isolated<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Typical build cost (per MW of IT load)<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Roughly $9M\u2013$14M (2026 industry benchmarks)<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Roughly $14M\u2013$22M (2026 industry benchmarks)<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400;\">Typical realistic timeline<\/span><\/td>\n<td><span style=\"font-weight: 400;\">Shorter design, procurement, and construction cycle<\/span><\/td>\n<td><span style=\"font-weight: 400;\">22\u201330 months is a commonly cited realistic range, including design, long-lead MEP procurement, construction, and multi-level commissioning<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span style=\"font-weight: 400;\">(Cost and timeline figures above reflect industry-reported 2026 construction benchmarks rather than fixed pricing, confirm current numbers with your contractor or consultancy before budgeting a specific project.)<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The uptime gap looks small on paper, roughly 70 additional minutes of availability per year, but for workloads where even a short outage is unacceptable, that gap is the entire reason Tier IV exists.<\/span><\/p>\n<h2><b>Certification vs. Design Conformance: A Distinction Most Buyers Miss<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Here&#8217;s something that trips up a lot of buyers evaluating providers or contractors: a facility described as &#8220;Tier III&#8221; or &#8220;Tier IV&#8221; isn&#8217;t automatically Uptime Institute certified. The Institute offers distinct certification stages:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Tier Certification of Design Documents (TCDD)<\/b><span style=\"font-weight: 400;\">, the blueprints conform to the tier requirements.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Tier Certification of Constructed Facility (TCCF)<\/b><span style=\"font-weight: 400;\">, the built facility has been inspected and confirmed to match the certified design.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Tier Certification of Operational Sustainability (TCOS)<\/b><span style=\"font-weight: 400;\">, ongoing operations and maintenance are confirmed to meet the tier&#8217;s requirements.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">A data center cannot self-certify. Many facilities market a tier level based on design conformance alone, without ever completing the constructed-facility or operational-sustainability stages. That&#8217;s not necessarily dishonest, but it does mean the practical resiliency you&#8217;re buying can differ from what the label implies. If a specific tier level matters to your compliance or contractual requirements, ask which certification stage, if any, the facility actually holds, rather than accepting the tier label at face value.<\/span><\/p>\n<h2><b>Cost and Timeline: What the Jump From Tier III to Tier IV Actually Costs<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">The cost gap between the two standards comes almost entirely from duplication. Tier III uses redundant components layered onto a single active distribution path, Tier IV requires every system, power, cooling, distribution, to be fully duplicated and physically isolated, active at the same time. Based on 2026 industry benchmarks, that jump commonly adds somewhere in the range of $5M\u2013$8M per megawatt of IT load, along with several additional months of schedule for the extra MEP (mechanical, electrical, plumbing) procurement and commissioning work.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Timeline matters as much as cost here. Long-lead items, generators and switchgear in particular, tend to be the schedule-critical factors on a Tier IV build, and the compartmentalization, dual utility feeds, and 2N infrastructure need to be designed in from the concept stage. Retrofitting an existing Tier III facility up to Tier IV standard is rarely the economical path, industry estimates put retrofit costs at 70\u201390% of what a purpose-built new Tier IV facility would cost, which is worth knowing before assuming you can upgrade later cheaply.<\/span><\/p>\n<h2><b>Uptime and Downtime Cost: Why a Few Minutes a Year Can Matter<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">It&#8217;s easy to look at 99.982% versus 99.995% and assume the difference is negligible. It stops looking negligible once you attach a real cost to downtime. Industry estimates for 2026 put the average cost of enterprise data center downtime somewhere between $300,000 and $540,000 per hour, depending on the business and workload involved. Against that backdrop, the roughly 70-minute annual gap between Tier III and Tier IV availability becomes a genuine financial variable, not just a specification on a data sheet, for the right workload, the incremental construction cost of Tier IV functions less like an expense and more like an insurance premium against outage cost.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">For workloads where an hour of downtime costs a few thousand dollars rather than hundreds of thousands, that same math points the other way, and Tier III&#8217;s lower cost and shorter timeline is the financially sound choice.<\/span><\/p>\n<h2><b>Which Standard Fits Your Business?<\/b><\/h2>\n<p><b>Tier III<\/b><span style=\"font-weight: 400;\"> has become the practical baseline for most enterprise and colocation workloads. It balances concurrent maintainability with meaningfully lower capital cost, and for general enterprise applications, e-commerce, SaaS platforms, and standard <a href=\"https:\/\/bharatdatacenter.com\/colocation-service\">colocation<\/a> tenants, it typically meets the actual availability requirement without paying for redundancy that goes unused.<\/span><\/p>\n<p><b>Tier IV<\/b><span style=\"font-weight: 400;\"> is generally justified where availability is genuinely non-negotiable: high-throughput financial trading systems, core banking infrastructure, national security or classified government workloads, and hyperscale zones supporting business-critical operations at massive scale. If your recovery time objective (RTO) and recovery point objective (RPO) are measured in seconds rather than minutes, or if a regulator specifically mandates fault-tolerant infrastructure, Tier IV is the standard that actually matches the requirement, not just the more impressive-sounding one.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A practical way to frame the decision: define your RTO\/RPO and your realistic cost-of-downtime first, then work backward to the tier that satisfies those numbers, rather than starting from which tier sounds more premium.<\/span><\/p>\n<h2><b>Design and Construction Considerations for Each Standard<\/b><\/h2>\n<p><b>Building to Tier III<\/b><span style=\"font-weight: 400;\"> typically involves<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Dual power distribution paths, with one active and one reserved for maintenance switching<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">N+1 redundancy across generators, UPS systems, and cooling units<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The ability to perform planned maintenance without a shutdown<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Acceptance of some residual risk during an unplanned failure on the active path<\/span><\/li>\n<\/ul>\n<p><b>Building to Tier IV<\/b><span style=\"font-weight: 400;\"> typically involves<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Fully separated, simultaneously active paths from the utility entrance through to the PDU (power distribution unit)<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Structural compartmentalization and, often, dual utility feeds and separated generator yards<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">2N (or 2N+1) MEP infrastructure designed in from the concept stage, not added later<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Meaningfully longer procurement and commissioning cycles, driven largely by generator and switchgear lead times<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">the Uptime Institute also runs a Tier-Ready program specifically for prefabricated and modular equipment manufacturers, giving them third-party validation that their modular designs already conform to Tier III or Tier IV requirements before they ever reach a job site. For projects under schedule pressure, factory-tested modular components built to a validated tier design can shorten deployment time compared with a fully custom traditional build, while still targeting the same reliability benchmark.<\/span><\/p>\n<h2><b>Common Mistakes When Choosing a Data Center Tier<\/b><\/h2>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Overbuilding to Tier IV<\/b><span style=\"font-weight: 400;\"> for workloads that don&#8217;t need it, tying up capital in redundancy that&#8217;s never actually exercised.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Underbuilding to Tier III or lower<\/b><span style=\"font-weight: 400;\"> for genuinely mission-critical, regulated, or life-safety-adjacent workloads, creating compliance and continuity risk.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Assuming a marketed &#8220;Tier III&#8221; or &#8220;Tier IV&#8221; label equals certification<\/b><span style=\"font-weight: 400;\">, rather than checking which certification stage, if any, the facility has actually completed.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Ignoring future scalability<\/b><span style=\"font-weight: 400;\">, then discovering retrofit costs from Tier III to Tier IV are close to the cost of building new.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Evaluating only against Uptime Institute<\/b><span style=\"font-weight: 400;\"> when a project&#8217;s actual market or regulatory context expects TIA-942 conformance instead, or in addition.<\/span><\/li>\n<\/ul>\n<h2><b>How a Data Center Construction Consultancy Helps<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Choosing between Tier III and Tier IV isn&#8217;t purely a technical decision, it sits at the intersection of workload requirements, budget, regulatory obligation, and construction realities that most internal IT or facilities teams don&#8217;t navigate on a regular basis. A dedicated data center construction consultancy typically brings:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Feasibility and tier-selection studies<\/b><span style=\"font-weight: 400;\"> grounded in your actual RTO\/RPO and workload criticality, rather than a default assumption.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>MEP design coordination<\/b><span style=\"font-weight: 400;\"> across power, cooling, and distribution systems appropriate to the chosen tier.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Contractor and vendor selection support<\/b><span style=\"font-weight: 400;\">, including evaluating modular\/prefabricated options against traditional builds.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Certification liaison<\/b><span style=\"font-weight: 400;\">, helping a project pursue the appropriate Uptime Institute or TIA-942 certification stage rather than settling for an unverified design claim.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><b>Cost and schedule management<\/b><span style=\"font-weight: 400;\"> across the long-lead procurement items that most commonly derail data center construction timelines.<\/span><\/li>\n<\/ul>\n<h2><b>Evaluate Your Data Center Project<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">Not sure whether your project&#8217;s availability requirements, budget, and timeline point toward Tier III or Tier IV? Walk through your RTO\/RPO targets and realistic downtime cost against the comparison above, or talk with the Bharat Data Center team about your specific workload and site requirements.<\/span><\/p>\n<p>Read More: <a href=\"https:\/\/bharatdatacenter.com\/ddos-protection\">DDoS Protection for Networks<\/a><\/p>\n<h2>Let\u2019s Get Connected<\/h2>\n<ul>\n<li><strong>LinkedIn: <\/strong><a href=\"https:\/\/www.linkedin.com\/company\/bharatdatacenter\/\" target=\"_blank\" rel=\"noopener\">com\/company\/bharatdatacenter<\/a><\/li>\n<li><strong>Facebook: <\/strong><a href=\"https:\/\/www.facebook.com\/bharatdatacenter\" target=\"_blank\" rel=\"noopener\">com\/bharatdatacenter<\/a><\/li>\n<li><strong>X (Twitter): <\/strong><a href=\"https:\/\/x.com\/b_datacenter\">com\/b_datacenter<\/a><\/li>\n<li><strong>Instagram: <\/strong><a href=\"https:\/\/www.instagram.com\/bharatdatacenter\/\" target=\"_blank\" rel=\"noopener\">com\/bharatdatacenter<\/a><\/li>\n<\/ul>\n<h2><b>FAQ<\/b><\/h2>\n<h3><b>What is the main difference between Tier III and Tier IV data centers?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Tier III is concurrently maintainable, meaning planned maintenance can happen without downtime, but some risk remains during an unplanned failure. Tier IV adds fault tolerance through fully independent, simultaneously active systems, so neither planned maintenance nor an unplanned failure affects operations.<\/span><\/p>\n<h3><b>Is Tier IV always better than Tier III?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Not necessarily better, more resilient, at meaningfully higher cost. For workloads that don&#8217;t require fault tolerance, Tier III typically delivers the required availability at a lower capital and operational cost.<\/span><\/p>\n<h3><b>How much more does a Tier IV data center cost to build than Tier III?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Based on 2026 industry benchmarks, the jump commonly adds roughly $5M\u2013$8M per megawatt of IT load, along with several additional months of construction schedule, though actual figures vary by project, region, and contractor.<\/span><\/p>\n<h3><b>Can a Tier III data center be upgraded to Tier IV later?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Technically yes, but it&#8217;s rarely cost-effective. Retrofit costs are commonly estimated at 70\u201390% of what a purpose-built Tier IV facility would cost, since Tier IV&#8217;s isolation and duplication generally need to be designed in from the concept stage.<\/span><\/p>\n<h3><b>What is the difference between Tier Certification and a &#8220;Tier III design&#8221; claim?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Certification requires third-party review from the Uptime Institute across specific stages, design documents, the constructed facility, and operational sustainability. A &#8220;Tier III design&#8221; claim without completed certification means the facility hasn&#8217;t necessarily been independently verified against the standard.<\/span><\/p>\n<h3><b>What does N+1 vs. 2N redundancy mean?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">N+1 means one extra redundant component beyond the minimum needed to run the load, the model Tier III typically uses. 2N means a fully duplicated, independent system running simultaneously, the model Tier IV requires.<\/span><\/p>\n<h3><b>Do I need Uptime Institute certification, or is TIA-942 compliance enough?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">It depends on your market and stakeholders. TIA-942 is a parallel standard using &#8220;Rated&#8221; terminology that some regions and clients specifically require or recognize, confirm which framework your regulatory or contractual context actually expects before committing to one certification path.<\/span><\/p>\n<h3><b>How long does it take to build a Tier III vs. Tier IV data center?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Tier IV commonly runs 22\u201330 months in realistic 2026 timelines, factoring in design, long-lead MEP procurement, construction, and multi-level commissioning. Tier III generally has a shorter cycle, largely because it avoids the fully duplicated, independently commissioned systems Tier IV requires.<\/span><\/p>\n<h3><b>What industries typically require Tier IV data centers?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">High-throughput financial trading systems, core banking infrastructure, national security and classified government workloads, and select hyperscale critical zones are the most commonly cited use cases where fault tolerance is treated as non-negotiable.<\/span><\/p>\n<h3><b>Does a higher tier always mean better performance?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Not performance in the traditional sense, tier level measures redundancy and fault tolerance, not processing speed or network throughput. A higher tier means greater resilience against failure and maintenance events, which is a different property from raw performance.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Tier III vs Tier IV Data Center Design: Choosing the Right Standard Choosing between Tier III and Tier IV data center design isn&#8217;t a question of which one is better, it&#8217;s a question of which redundancy model, uptime guarantee, and construction budget actually match your workload. Get it wrong in either direction, and you either [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":674,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[20],"tags":[71,77,133,134],"class_list":["post-672","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-data-center","tag-data-center-construction","tag-data-center-construction-consultancy","tag-data-center-in-india","tag-data-center-infrastructure"],"_links":{"self":[{"href":"https:\/\/bharatdatacenter.com\/blog\/wp-json\/wp\/v2\/posts\/672","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bharatdatacenter.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bharatdatacenter.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bharatdatacenter.com\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/bharatdatacenter.com\/blog\/wp-json\/wp\/v2\/comments?post=672"}],"version-history":[{"count":1,"href":"https:\/\/bharatdatacenter.com\/blog\/wp-json\/wp\/v2\/posts\/672\/revisions"}],"predecessor-version":[{"id":673,"href":"https:\/\/bharatdatacenter.com\/blog\/wp-json\/wp\/v2\/posts\/672\/revisions\/673"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bharatdatacenter.com\/blog\/wp-json\/wp\/v2\/media\/674"}],"wp:attachment":[{"href":"https:\/\/bharatdatacenter.com\/blog\/wp-json\/wp\/v2\/media?parent=672"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bharatdatacenter.com\/blog\/wp-json\/wp\/v2\/categories?post=672"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bharatdatacenter.com\/blog\/wp-json\/wp\/v2\/tags?post=672"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}